Industry news|2022-06-06| admin
The installation of the planetary gearbox is a relatively simple process, but some details need to be paid attention to during the installation process. The installation process of the planetary gearbox is roughly divided into three steps: inspection size, installation, and testing. The main thing is to confirm the planetary gear. The coaxiality of the gearbox during installation will have a great impact, so let's learn about the installation process of the planetary gearbox and some precautions!
Before installing the planetary gearbox and the motor, it is necessary to confirm whether they are in good condition, and it is necessary to check whether the dimensions of the connected parts match, mainly referring to whether the installation size between the motor and the gearbox is correct.
Send the screws of the dust-proof holes on the outer side of the planetary gearbox, adjust the position to align the side holes and the dust-proof holes, remove the motor shaft key, and carry out anti-rust treatment on the installation parts of the motor and the gearbox to ensure the tightness of the connection and the later operation. of fluency.
When connecting, it is necessary to ensure that the coaxiality between the two is consistent. If it is inconsistent, it will affect the later operation, wear the internal gear of the gearbox or break the shaft. During the installation process, it is forbidden to hit the gearbox with a hammer to prevent damage caused by excessive axial force or radial force.
When the gearbox and the motor are connected, first install the diagonal screws to ensure uniform force, then install the other two diagonal bolts, tighten the four mounting bolts one by one, and finally tighten the captive screws on both sides, some high-precision installation requires the use of a torque wrench.
After the gearbox is installed, it needs to be fixed on the bracket, and the stability of the installation needs to be ensured. If the gearbox is unstable during high-speed operation, it may cause vibration and external noise, which will indirectly affect the coaxiality of the installation. When gears or other components are externally installed during transmission, protective devices need to be installed. After the installation is completed, check the stability and flexibility of the installation parts in turn, and the idling test can be carried out. The operation process should be relatively stable, without obvious vibration and noise. When there are some abnormal phenomena, the problem should be eliminated.
The planetary gearbox needs to be carefully installed during the installation process. Good installation can achieve twice the result with half the effort. Installation according to standard procedures can save a lot of maintenance costs in the later period. If the coaxiality is inconsistent during installation, it will have a great impact on the later use and the gearbox itself. Therefore, during the installation of the gearbox, attention must be paid to the coaxiality of the gearbox and some details.
| 奶水少妇被狂躁c到高潮喷水麻豆 | 色欲淫香综合插插插影视 | 蜜臀99久久精品久久久久久软件 | 99re视频在线观看 | 国产妇女野外牲一级毛片 | 一本色到久久HEZYO无码 | ,国产精品久久久久久 | 强行糟蹋人妻HD中文字幕2 | 亚洲日韩国产AV无码无码精品 | 无码做爰XXXⅩ性开放国语 | 午夜激情视频在线观看 | 91丰满人妻光屁股撅起来 | 精品3D肉动漫AVA片在线观看 | 国产免费黄色中文字幕视频 | 成人无码高清123区 丁香婷婷一区二区三区 | 小向美奈子A片在线观看 | 免费白丝内内在线看 | 特级做a爰片毛片A片下载老人 | 极品JK小仙女自慰喷水牛牛影视 | 蜜桃天堂欧洲成人久久一区亚洲 | 777午夜福利理论电影网 | 三级在线观看午夜福利 | 国产精品色情免费视频 | 成av人片一区二区三区久久 | 久久久精品欧美一区二区白云视色 | 黄片免费国产中文字幕视频 | 中文字幕久久综合 | 亚洲va欧洲va国产va | 丝袜 亚洲 另类 欧美 重口 | 水多多www视频在线观看高清 | 国产av一区二区三区无码野战 | 国产囗爆吞精一区二区 | 免费无码婬片A片名字 | 91秘 片黄在线观看 变态调教一区二区三区 | 黄色视频网站在线观看免费 | 精品欧美黑人一区二区三区 | 欧美mv日韩mv国产网站小说 | 午夜大尺度色无码专区 | HEYZO无码专区人妻有奶水 | 开心婷婷五月色蜜桃在线 |